EV FOR LESS
Installation Pacakge 11/22kW, 3-Phase
Installation Pacakge 11/22kW, 3-Phase
Couldn't load pickup availability
Professional EV Charger Installation — 11/22kW Three-Phase
Everything handled from cable to charger — all materials, labour, and a 2-year warranty included. No hidden costs. Ideal for villa owners and commercial premises requiring higher-power three-phase charging.
What's Included
- Cabling: 5×6 mm² cable in 32mm surface-mounted PVC conduit
- Cable run: Up to 5m (additional cable charged at 50 AED/m)
- Protection: 40A RCCB/ELCB 30mA + 40A Isolator + MCB 6kA 40A (if needed)
- Installation time: 2–3 hours on-site
- Warranty: 2 years on all workmanship & materials
Optional Add-Ons (Extra Cost)
- Interlock floor removal & reinstatement: 35 AED/m
- Other civil works — quoted on-site based on scope
- Distribution board (DB) upgrades or new circuit additions — quoted separately
- Authority NOC or permit fees — we advise and assist; fees are authority-set
Compatible With
Suitable for all major 11kW and 22kW three-phase EV chargers.
How It Works
- Book online — purchase this service to confirm your slot
- WhatsApp assessment — our engineer contacts you to request a short video from your DB panel to the charger location, and checks your DB capacity. In most cases, no site visit is needed.
- Site survey (if required) — for complex setups, an on-site visit is arranged (250 AED — fully refunded upon installation completion)
- Installation day — technician arrives, installs, tests, and signs off
- Handover — you receive an invoice with warranty details
Frequently Asked Questions
Do you cover my area?
We currently serve all Emirates. Contact us via WhatsApp to confirm availability in your location.
How soon can I get an appointment?
Our engineer will contact you within 2 hours of booking to assess and schedule your installation.
What if my DB needs upgrading?
If the site assessment reveals your DB requires an upgrade or a new circuit, we will advise you on the additional scope and cost before proceeding — no surprises.
Is three-phase power available at my property?
Not all residential properties in the UAE have three-phase supply. Our engineer will confirm this during the WhatsApp assessment before scheduling your installation.
Can this be installed in an apartment?
Yes, subject to building management approval and available DB capacity, which we assess during the WhatsApp or site survey stage.
📞 Ready to get started? Add to cart and our engineer will be in touch within 2 hours.
Share
